Catalog

The determining value in the timbre of an instrument depends on this detail. We made bocals from brass, copper, and silver.

Company

The production of wind instruments is one of our priority goals and we are hardly working to achieve it!

You might look for

Production of wind instruments by real masters of their craft

Production of wind instruments by real masters of their craft

The production of wind instruments is one of our priority goals and we are painstakingly working to achieve it! High-precision computer-controlled equipment ensures a high level of product quality. Cooperating with world leaders helps to achieve high quality standards.

10

10 million dollars of investments in equipment and technology development

10 million dollars of investments in equipment and technology development
70

Highly qualified specialists in the staff, united by one goal — to create the perfect instrument

Highly qualified specialists in the staff, united by one goal — to create the perfect instrument
1000

We sign 1,000 contracts a year across the country, and all of our customers are satisfied

We sign 1,000 contracts a year across the country, and all of our customers are satisfied

Production stages

Design Bureau
Machining technology
Casting line
Lacquering and galvanic coating
Surface treatment shop
Pre-assembly
Final assembly and adjustment
Design Bureau Machining technology Casting line Lacquering and galvanic coating Surface treatment shop Pre-assembly Final assembly and adjustment

The process includes mathematical modeling, creating product drawings, and assembling components from parts in a special system.

The machining process includes the selection of a machining strategy, the selection of cutting tools and special tooling, as well as the development (writing) of a CNC program.

As a result, high accuracy and repeatability of parts are achieved.

Final processing shop

The surface treatment shop performs grinding and polishing, both automatic and manual (including tumbling, etc.)

Soldering, parts fitting

The event features the participation of high-level musicians.

Official quality confirmation
Certificate

Official quality confirmation

Each of our wind instruments is strictly controlled and has an official certificate of conformity. This document ensures that the product meets all safety, environmental and technical standards.

Official quality confirmation

From idea to implementation

Configurator Step 1
Configurator Step 2
Configurator Step 3
Configurator Step 4
Configurator Step 5
Configurator Step 6
Configurator Step 7
Configurator Step 8
Configurator Step 9